Laval Metro extension

À propos du projet

Emplacement Montreal

Secteur(s) d'activité Transportation infrastructure

Description

Completed as part of a joint venture, this project involved tunnel work and electrical room installations for the 5 km extension of the Montréal Metro’s Orange Line (three stations). The scope included guide bar installation, train signaling and control systems, 25 kV distribution, tunnel lighting, and communication systems.
Total value of work performed: over $22 million.

Prolongation du Métro vers Laval

Réalisations pour le même secteur d’activité