Battery cathode material manufacturer

À propos du projet

Emplacement Ultium CAM Plant in Bécancour

Secteur(s) d'activité Industrial projects

Description

We completed the installation of 15 kV cables between the main substation and various buildings within the facility, including method design, cable pulling, and terminations.

We also carried out the full installation of all low-voltage power cables over 350 MCM within the plant. The multi-level routing, complex cable tray configurations, and numerous bends and elevation changes required advanced engineering of pulling methods. All work was fully modeled in 3D by our team to facilitate dynamic load calculations and ensure perfectly safe pulling operations for workers.

Example of 3D modeling of a cable pull on the plant’s main cable rack.

Tirage et raccordement du réseau 15 kV de l’usine